Quote-Ready Now Self-Performed Licensed & Insured
Commercial & Heavy-Civil Construction

Microtunnelling and Pipe Jacking

Harrowgate manages and self-performs shaft, excavation, support, slurry, jacking, line and grade control, annulus treatment, tie-ins, and restoration for GTA and Ontario trenchless crossings. Harrowgate Group self-performs the work to your engineered drawings, load, and finish, and completes it on site across the GTA and Ontario.

Get a Quote

Tell us what you need and we’ll get you a quote. Licensed, insured & WSIB certified · Free, no-obligation quote & on-site assessment.

Free, no-obligation quote & on-site assessment · licensed, insured & WSIB certified.

or
Call (416) 629-0721

Get a Quote

Licensed, insured & WSIB certified · Free, no-obligation quote & on-site assessment.

Free, no-obligation quote & on-site assessment · licensed, insured & WSIB certified.

or
Call (416) 629-0721
Licensed, Insured & WSIB Certified · 20 Years in Business
Licensed, Insured & WSIB-Registered Completed to code & Ontario requirements Built to drawings, self-performed & completed Shipped across Canada & North America
Why Harrowgate Group

Microtunnelling and Pipe Jacking, done right

Built to spec

Built to your engineered drawings, survey, and the real site conditions, not a standard package forced to fit.

Made to last

Heavy-duty steel and finishes chosen for the load, traffic, and environment on site.

Quote-ready

Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.

Code-conscious

Installation and site work completed in accordance with Ontario requirements.

Our Process

Our Process

Microtunnelling and pipe jacking install pipelines between shafts by remotely excavating at the face while hydraulic jacks advance purpose-designed pipe. Harrowgate manages and self-performs the GTA civil works, including shafts, support, dewatering, launch setup, spoil and slurry handling, jacking operations, survey control, lubrication, reception, tie-ins, and surface restoration.

  1. 01 Send your inquiry, drawings, photos, or a description of what you need.
  2. 02 We come measure and assess the site (or work from your specs and drawings).
  3. 03 We build your microtunnelling and pipe jacking to the engineered drawings on site, finished for the conditions.
  4. 04 We return to deliver and install it, set, levelled, and done right on site.
Microtunnelling and Pipe Jacking being built and completed on site by Harrowgate Group
Completed Microtunnelling and Pipe Jacking installation by Harrowgate Group
Finished On Site

Delivered, installed, and built to last

Self-performed on site to the engineered drawings, coordinated with concrete, servicing, and the surrounding work, then a clean, documented finish.

  • Coordinated with the surrounding build
  • Durable finishes for real-world wear
  • Quote-ready support from spec to delivery
FAQ

Microtunnelling and Pipe Jacking FAQ

What is the difference between microtunnelling and pipe jacking?

Microtunnelling is a remotely operated guided excavation process that controls the face and line and grade, often using slurry to transport spoil. Pipe jacking is the structural process of pushing the pipeline from a launch shaft. Most microtunnel drives use pipe jacking, but other pipe-jack methods can use different excavation systems.

What ground can a microtunnel boring machine handle?

Machine and cutterhead selection can address soft clay, sand, gravel, cobbles, mixed face, and rock within defined ranges. Groundwater pressure, boulder frequency, abrasivity, strength, contamination, and obstruction risk matter as much as soil name. A targeted geotechnical program and drive-specific equipment selection are required before launch.

How is line and grade controlled underground?

A surveyed launch network feeds a laser, target, gyroscopic, or combined guidance system that reports machine position and attitude. Operators make small steering corrections while independent survey checks verify control. Harrowgate monitors launch-frame stability, joint deflection, and trend by chainage so error is corrected early rather than near reception.

What limits the length of a pipe-jacking drive?

Drive length depends on pipe jacking capacity, ground friction, alignment, lubrication, shaft space, machine and slurry performance, joint deflection, and available intermediate jacking stations. Harrowgate models expected and maximum forces, tracks actual load per metre, and activates lubrication or intermediate stations within the engineered operating plan.

How is settlement controlled during microtunnelling?

Settlement control combines stable face pressure, excavation-volume balance, suitable steering, prompt pipe advance, lubrication, annular control, shaft support, and groundwater management. Surface and structure points are monitored at defined frequency. Harrowgate links movement readings to face pressure, slurry data, advance, and chainage so trends trigger immediate operational response.

What happens to microtunnelling slurry and spoil?

Return slurry passes through separation equipment that removes excavated solids and conditions fluid for reuse. Solids, spent slurry, and additives are characterized and managed under project and Ontario requirements. O. Reg. 406/19 includes current provisions for soil excavated by slurry or micro-tunnel boring machines where polymers or foaming agents are added.

What is included after the bore reaches the reception shaft?

Harrowgate recovers the machine, surveys the installed drive, completes specified annulus treatment, inspects or tests pipe and joints, constructs chambers and carrier connections, manages shaft conversion or backfill, and restores roads and landscapes. Closeout includes alignment, jacking force, lubrication, slurry, settlement, pipe, and material records.

Our Work

See real projects across Toronto & Ontario

Commercial and heavy-civil construction, self-performed for developers, contractors, property managers, and municipalities.

View Our Projects

Get a quote for microtunnelling and pipe jacking

Send drawings, a site plan, or a description of the scope. Harrowgate Group is licensed, insured, and WSIB certified.

(416) 629-0721

Licensed, Insured & WSIB Certified · Self-performed and documented on every job

Send your project details

Tell us what you need and we’ll get you a quote. Licensed, insured & WSIB certified · Free, no-obligation quote & on-site assessment.

Free, no-obligation quote & on-site assessment · licensed, insured & WSIB certified.

or
Call (416) 629-0721

Companies We've Worked With

Trusted by Leading Organizations

Harrowgate Group delivers commercial and heavy-civil construction for developers, contractors, institutions, municipalities, and property groups across Ontario.

Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Call