Commercial & Heavy-Civil Construction

Pump Stations and Lift Stations

Harrowgate self-performs commercial, industrial, and municipal pump station construction across the GTA and Ontario, integrating excavation, wet wells, pumps, forcemains, valves, controls, standby provisions, testing, and site restoration. Harrowgate Group self-performs the work to your engineered drawings, load, and finish, and completes it on site across the GTA and Ontario.

Get a Quote

Tell us what you need and we’ll get you a quote. Licensed, insured & WSIB certified · Free, no-obligation quote & on-site assessment.

Free, no-obligation quote & on-site assessment · licensed, insured & WSIB certified.

or
Call (416) 629-0721

Get a Quote

Licensed, insured & WSIB certified · Free, no-obligation quote & on-site assessment.

Free, no-obligation quote & on-site assessment · licensed, insured & WSIB certified.

or
Call (416) 629-0721
Licensed, Insured & WSIB Certified · 20 Years in Business
Licensed, Insured & WSIB-Registered Completed to code & Ontario requirements Built to drawings, self-performed & completed Shipped across Canada & North America
Why Harrowgate Group

Pump Stations and Lift Stations, done right

Built to spec

Built to your engineered drawings, survey, and the real site conditions, not a standard package forced to fit.

Made to last

Heavy-duty steel and finishes chosen for the load, traffic, and environment on site.

Quote-ready

Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.

Code-conscious

Installation and site work completed in accordance with Ontario requirements.

Our Process

Our Process

A pump station collects wastewater, stormwater, or process water at a low point and lifts it through a pressurized discharge when gravity flow cannot reach the receiving system. Harrowgate self-performs complete commercial, industrial, and municipal station construction across the GTA, coordinating civil, structural, mechanical, electrical, controls, forcemain, commissioning, and restoration work around the engineer’s design.The station is a hydraulic system, not simply a pump inside a chamber.

  1. 01 Send your inquiry, drawings, photos, or a description of what you need.
  2. 02 We come measure and assess the site (or work from your specs and drawings).
  3. 03 We build your pump stations and lift stations to the engineered drawings on site, finished for the conditions.
  4. 04 We return to deliver and install it, set, levelled, and done right on site.
Pump Stations and Lift Stations being built and completed on site by Harrowgate Group
Completed Pump Stations and Lift Stations installation by Harrowgate Group
Finished On Site

Delivered, installed, and built to last

Self-performed on site to the engineered drawings, coordinated with concrete, servicing, and the surrounding work, then a clean, documented finish.

  • Coordinated with the surrounding build
  • Durable finishes for real-world wear
  • Quote-ready support from spec to delivery
FAQ

Pump Stations and Lift Stations FAQ

What is the difference between a pump station and a lift station?

A lift station usually refers to equipment that raises wastewater from a lower elevation into a higher gravity sewer or forcemain. Pump station is the broader term and can include sewage, stormwater, process water, or drinking-water duties. The design basis, fluid, redundancy, controls, and discharge system define the construction scope.

How are sewage lift station pumps sized?

The engineer selects pumps from design flow and total dynamic head, including static lift, pipe friction, fittings, valves, wet-well level, and forcemain condition. Pump and system curves are checked across operating extremes. Harrowgate verifies installed equipment, piping, rotation, measured drawdown, flow, controls, and motor operation against the approved design during commissioning.

Why do lift stations use two or more pumps?

Multiple pumps provide firm capacity when one unit is unavailable and allow flow to be matched across changing conditions. Lead and lag duties alternate to balance run time. For two equal sewage pumps, MECP guidance expects capacity with one unit out of service to handle at least the 10-year design peak hourly flow.

What prevents a wet well from floating in high groundwater?

The structural engineer checks the empty structure against groundwater uplift and designs the required dead weight, base extension, anti-flotation slab, anchors, or other restraint. Harrowgate builds the specified base, controls groundwater during construction, records founding and concrete work, seals penetrations, and sequences backfill so the structure is not exposed to unintended uplift.

Can an existing lift station be replaced without stopping service?

Yes. We establish temporary bypass pumping before isolating the existing station. The bypass plan accounts for peak incoming flow, connection points, standby capacity, power or fuel, alarms, monitoring, and emergency response. It remains active until the new wet well, pumps, forcemain, electrical service, controls, and alarm sequence complete the agreed commissioning tests.

What testing is completed before a pump station is placed in service?

Testing covers structure and pipe leakage where specified, forcemain pressure, pump rotation, valve operation, instrument calibration, point-to-point controls, alarm transmission, lead-lag alternation, drawdown, flow rate, operating levels, cycle time, power failure, standby supply, and recovery. Results are compared with approved pump curves, setpoints, and the control narrative.

What information is needed to quote a pump or lift station?

Provide civil, structural, mechanical, and electrical drawings, design flows, pump data, system curves, forcemain profile, geotechnical report, groundwater level, control narrative, approval conditions, utility information, bypass requirements, and commissioning specification. Existing-site records, operating trends, access limits, and shutdown windows are essential for retrofit and replacement pricing.

Our Work

See real projects across Toronto & Ontario

Commercial and heavy-civil construction, self-performed for developers, contractors, property managers, and municipalities.

View Our Projects

Get a quote for pump stations and lift stations

Send drawings, a site plan, or a description of the scope. Harrowgate Group is licensed, insured, and WSIB certified.

(416) 629-0721

Licensed, Insured & WSIB Certified · Self-performed and documented on every job

Send your project details

Tell us what you need and we’ll get you a quote. Licensed, insured & WSIB certified · Free, no-obligation quote & on-site assessment.

Free, no-obligation quote & on-site assessment · licensed, insured & WSIB certified.

or
Call (416) 629-0721

Companies We've Worked With

Trusted by Leading Organizations

Harrowgate Group delivers commercial and heavy-civil construction for developers, contractors, institutions, municipalities, and property groups across Ontario.

Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Call