Quote-Ready Now Self-Performed Licensed & Insured
Commercial & Heavy-Civil Construction

Pipe Bursting

Replace failed sewer, water, and process pipelines with fewer open excavations. Harrowgate Group self-performs and manages pipe bursting for commercial, industrial, municipal, and heavy-civil sites across the GTA and Ontario.

Get a Quote

Tell us what you need and we’ll get you a quote. Licensed, insured & WSIB certified · Free, no-obligation quote & on-site assessment.

Free, no-obligation quote & on-site assessment · licensed, insured & WSIB certified.

or
Call (416) 629-0721

Get a Quote

Licensed, insured & WSIB certified · Free, no-obligation quote & on-site assessment.

Free, no-obligation quote & on-site assessment · licensed, insured & WSIB certified.

or
Call (416) 629-0721
Licensed, Insured & WSIB Certified · 20 Years in Business
Licensed, Insured & WSIB-Registered Completed to code & Ontario requirements Built to drawings, self-performed & completed Shipped across Canada & North America
Why Harrowgate Group

Pipe Bursting, done right

Built to spec

Built to your engineered drawings, survey, and the real site conditions, not a standard package forced to fit.

Made to last

Heavy-duty steel and finishes chosen for the load, traffic, and environment on site.

Quote-ready

Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.

Code-conscious

Installation and site work completed in accordance with Ontario requirements.

Our Process

Our Process

Pipe bursting is a trenchless replacement method that fractures or splits an existing pipeline, displaces the fragments into the surrounding ground, and pulls a new factory-made pipe through the same alignment. Harrowgate Group self-performs pipe bursting across the GTA for commercial, industrial, municipal, and heavy-civil pipeline renewal.The method replaces the host pipe rather than lining it, so the new pipe provides its own structural capacity.

  1. 01 Send your inquiry, drawings, photos, or a description of what you need.
  2. 02 We come measure and assess the site (or work from your specs and drawings).
  3. 03 We build your pipe bursting to the engineered drawings on site, finished for the conditions.
  4. 04 We return to deliver and install it, set, levelled, and done right on site.
Pipe Bursting being built and completed on site by Harrowgate Group
Completed Pipe Bursting installation by Harrowgate Group
Finished On Site

Delivered, installed, and built to last

Self-performed on site to the engineered drawings, coordinated with concrete, servicing, and the surrounding work, then a clean, documented finish.

  • Coordinated with the surrounding build
  • Durable finishes for real-world wear
  • Quote-ready support from spec to delivery
FAQ

Pipe Bursting FAQ

Can pipe bursting increase the diameter of an existing pipe?

Yes, pipe bursting can install a larger replacement pipe when cover, soil, utility clearances, host material, connection elevations, and bursting equipment support the required expansion. The increase is engineered for the corridor. Harrowgate verifies displacement risk and hydraulic geometry before accepting an upsizing plan.

Which existing pipe materials can be burst?

Brittle materials such as vitrified clay, cast iron, and some concrete pipes are common candidates. Ductile materials, steel repairs, heavy couplings, concrete encasement, and unusual transitions need cutting, splitting equipment, or a point excavation. CCTV and record review determine whether the full route is burstable.

Does pipe bursting eliminate excavation?

No. Pipe bursting reduces continuous trenching, but it still requires launch and receiving pits plus access at services, obstructions, valves, fittings, or grade corrections. The commercial advantage depends on how many excavations remain and how much pavement, traffic control, landscaping, and site operation disruption they avoid.

How are sewer laterals handled during a mainline burst?

Each active lateral is located, disconnected from the host pipe, protected from the bursting operation, and reconnected to the new main using the specified fitting and seal. Harrowgate coordinates bypass or interruption requirements, documents every connection, and verifies the completed main by CCTV before acceptance.

Can pipe bursting correct a sag in a gravity sewer?

Not reliably without direct correction. A replacement pipe often follows the existing path, so a sag can remain. When grade must be restored, Harrowgate places an access pit at the low section, corrects the bedding elevation, and controls the new invert before continuing the burst and post-installation CCTV.

How do you protect nearby utilities during pipe bursting?

We review records, obtain Ontario One Call locates, daylight critical crossings, assess soil and cover, control the expander size, and monitor exposed utilities and ground movement during pullback. An abnormal force increase stops the operation for investigation. Clearance is verified in the field where displacement could affect another asset.

What information is needed to price pipe bursting?

Provide alignment and profile drawings, host pipe material and diameter, CCTV, service locations, geotechnical data, utility records, flow information, shutdown limits, surface restoration requirements, and available staging space. Harrowgate uses these details to define pits, equipment, replacement pipe, bypass needs, reconnections, testing, and restoration.

How is a completed pipe burst accepted?

Acceptance depends on service. Gravity sewer work typically includes connection verification, post-installation CCTV, grade review, and specified leakage or deflection testing. Pressure pipe work includes joint records, pressure testing, flushing, and commissioning. Potable water sections also follow MECP disinfection and microbiological sampling requirements before connection.

Our Work

See real projects across Toronto & Ontario

Commercial and heavy-civil construction, self-performed for developers, contractors, property managers, and municipalities.

View Our Projects

Get a quote for pipe bursting

Send drawings, a site plan, or a description of the scope. Harrowgate Group is licensed, insured, and WSIB certified.

(416) 629-0721

Licensed, Insured & WSIB Certified · Self-performed and documented on every job

Send your project details

Tell us what you need and we’ll get you a quote. Licensed, insured & WSIB certified · Free, no-obligation quote & on-site assessment.

Free, no-obligation quote & on-site assessment · licensed, insured & WSIB certified.

or
Call (416) 629-0721

Companies We've Worked With

Trusted by Leading Organizations

Harrowgate Group delivers commercial and heavy-civil construction for developers, contractors, institutions, municipalities, and property groups across Ontario.

Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Call