Quote-Ready Now Self-Performed Licensed & Insured
Commercial & Heavy-Civil Construction

Spread and Strip Footings

Harrowgate self-performs reinforced spread and strip footings for commercial, industrial, institutional, and heavy-civil structures across the GTA and Ontario, with bearing verification, precise reinforcing, and controlled concrete placement. Harrowgate Group self-performs the work to your engineered drawings, load, and finish, and completes it on site across the GTA and Ontario.

Get a Quote

Tell us what you need and we’ll get you a quote. Licensed, insured & WSIB certified · Free, no-obligation quote & on-site assessment.

Free, no-obligation quote & on-site assessment · licensed, insured & WSIB certified.

or
Call (416) 629-0721

Get a Quote

Licensed, insured & WSIB certified · Free, no-obligation quote & on-site assessment.

Free, no-obligation quote & on-site assessment · licensed, insured & WSIB certified.

or
Call (416) 629-0721
Licensed, Insured & WSIB Certified · 20 Years in Business
Licensed, Insured & WSIB-Registered Completed to code & Ontario requirements Built to drawings, self-performed & completed Shipped across Canada & North America
Why Harrowgate Group

Spread and Strip Footings, done right

Built to spec

Built to your engineered drawings, survey, and the real site conditions, not a standard package forced to fit.

Made to last

Heavy-duty steel and finishes chosen for the load, traffic, and environment on site.

Quote-ready

Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.

Code-conscious

Installation and site work completed in accordance with Ontario requirements.

Our Process

Our Process

Spread footings distribute concentrated column loads over engineered soil, while strip footings carry continuous wall loads along a wider bearing area. Harrowgate self-performs both systems across the GTA, including excavation trimming, bearing preparation, formwork, reinforcing, dowels, concrete placement, curing, and survey-controlled interfaces.Footing geometry is load-path work.

  1. 01 Send your inquiry, drawings, photos, or a description of what you need.
  2. 02 We come measure and assess the site (or work from your specs and drawings).
  3. 03 We build your spread and strip footings to the engineered drawings on site, finished for the conditions.
  4. 04 We return to deliver and install it, set, levelled, and done right on site.
Spread and Strip Footings being built and completed on site by Harrowgate Group
Completed Spread and Strip Footings installation by Harrowgate Group
Finished On Site

Delivered, installed, and built to last

Self-performed on site to the engineered drawings, coordinated with concrete, servicing, and the surrounding work, then a clean, documented finish.

  • Coordinated with the surrounding build
  • Durable finishes for real-world wear
  • Quote-ready support from spec to delivery
FAQ

Spread and Strip Footings FAQ

What is the difference between a spread footing and a strip footing?

A spread footing is generally a discrete pad that distributes a column or pier load. A strip footing is continuous and distributes a wall load along its length. The engineer sets each footing's dimensions and reinforcing from structural loads, soil bearing capacity, settlement limits, eccentricity, and the geometry of the supported member.

Who approves the soil before footing concrete is placed?

The project's geotechnical consultant reviews the exposed founding material against the geotechnical recommendations. Harrowgate prepares and protects the surface, exposes questionable zones, completes directed corrective work, and keeps the area accessible. Concrete placement proceeds after required geotechnical, structural, and municipal hold points have been released.

Can strip footings step with a changing site elevation?

Yes. The structural drawings define each step length, height, reinforcing continuity, and wall transition. Harrowgate forms the step accurately, installs the scheduled continuity and diagonal bars, consolidates concrete into the lower corner, and checks wall starter positions. Unplanned vertical offsets are referred to the engineer before work continues.

How are column dowels held accurately in a spread footing?

Column dowels are assembled into a cage and secured to a rigid template or braced support. We check centreline, bar spacing, cage rotation, verticality, and projection before placement. Concrete is placed evenly around the cage and vibrated without contacting the bars excessively, followed by a position check before initial set.

What causes a spread footing to settle?

Settlement can result from inadequate bearing capacity, disturbed soil, undocumented fill, loose replacement material, groundwater-related softening, or loads that differ from the design. Harrowgate controls the construction variables by exposing intact bearing, following geotechnical replacement direction, compacting specified fill, preventing water damage, and documenting the accepted founding surface.

Are footing dimensions allowed to change in the field?

No structural footing dimension should be reduced or shifted without written engineering direction. Unexpected services, rock, property constraints, or over-excavation can require a revised detail. Harrowgate documents the condition, protects the bearing area, and coordinates a buildable response with the structural and geotechnical consultants before concealment.

How long after a footing pour can wall or column work start?

The required delay depends on concrete strength gain, temperature, member loads, form pressure, and the engineer's criteria. Harrowgate tracks placement time, curing conditions, and available test results, then sequences wall forms, column cages, or construction loading only after the applicable release has been met.

Our Work

See real projects across Toronto & Ontario

Commercial and heavy-civil construction, self-performed for developers, contractors, property managers, and municipalities.

View Our Projects

Get a quote for spread and strip footings

Send drawings, a site plan, or a description of the scope. Harrowgate Group is licensed, insured, and WSIB certified.

(416) 629-0721

Licensed, Insured & WSIB Certified · Self-performed and documented on every job

Send your project details

Tell us what you need and we’ll get you a quote. Licensed, insured & WSIB certified · Free, no-obligation quote & on-site assessment.

Free, no-obligation quote & on-site assessment · licensed, insured & WSIB certified.

or
Call (416) 629-0721

Companies We've Worked With

Trusted by Leading Organizations

Harrowgate Group delivers commercial and heavy-civil construction for developers, contractors, institutions, municipalities, and property groups across Ontario.

Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Call